[Company Logo Image] Home Back Who is PE-LLC?

   Service Second to None

Performance Testing Hydro Testing Dye Dilution Testing Steam Path Audits Video Inspection Training Classes

 

Can the unit produce more megawatts?
Does the circ pump need to be overhauled?
What is the condenser backpressure deviation?
How is the cycle efficiency impacted by the circ system?
Is the cooling tower capacity sufficient for the heat load?

 

 

Dye Dilution Testing by PE LLC is the inexpensive way to get quick, accurate answers to these questions.

 

 

Dye Dilution Method

Large Flows are very difficult to measure accurately.  Traditional Methods are inaccurate or non-repeatable.  Dye dilution offers a non-intrusive way to obtain highly accurate and repeatable results.  By injecting a known concentration at a known rate and measuring a diluted sample, the true flow rate can be calculated very accurately.

 

 

Applications

bullet

Combined cycle, conventional, and nuclear turbine cycles

bullet

Condenser testing and troubleshooting

bullet

Circ pump and cooling tower performance and condition evaluation

bullet

Circ tunnel leakage and recirculation detection

bullet

Fresh, salt, and wastewater applications

bullet

Open channel flow

 

 

Information Request Form

Select the items that apply, and then let us know how to contact you.

Send service literature
Send company literature
Have a salesperson contact me

Name
Title
Company
Address
E-mail
Phone

 

 

Home ] Performance Testing ] Hydro Testing ] [ Dye Dilution Testing ] Steam Path Audits ] Video Inspection ] Training Classes ]

Last modified: December 18, 2008